Considering the Huge Potentiality in the development rastructure i.e. Road Construction, Bridges, Housing etc. The existing parity is not sufficient to meet the requirements of the customers. f lerefore, the partners have decided to undertake the Expansion Programme. They are confident to complete the Expansion Programme within schedule time.
The concrete is placed in slowly rotating steel mould and is held place in the pipe well by centrifugal action. The mould is taken subjected to concussion, which agitates the individual particles which rise freely to :ne inside surface of the pipe having only a very short distance to travel greaser them the wall thickness of the pipe.
Products Details is shown in table bellow.
| Product Desc | Class | Details |
|---|---|---|
| 100 mm To 1200 mm | NP2/NP3/NP4 | Cement Articles |
| 100 mm To 1200 mm | NP2/NP3/NP4 | Water Tanks |
| 100 mm To 1200 mm | NP2/NP3/NP4 | Septic Tanks |
| 100 mm To 1200 mm | NP2/NP3/NP4 | Pipes |